Reforma edificio en tigre

Renovation · ARQUITECTURA FN

Building Renovation

← Back to projects

PROJECT FACTS

Design
Building Renovation

DESIGN REASONING

Condition

A traditional linear house had been converted into a multi-story building without drawings or a permit, and construction had been shut down.

Operation

The structure was surveyed, reinforcement was defined, the design was brought into compliance and the documents required for municipal filing were produced.

Outcome

The drawings were approved and the property was regularized, clearly distinguishing the proposed design from the decisions ultimately built by the owner.

CONTINUITY

A project is not a finished image. It is an organization of decisions.

If you are considering a house, renovation or development, the first conversation helps us understand the real conditions before proposing a form.

ARQUITECTURA FN + ARQUIENER S.A.

From design to construction, with fewer handoffs.

Fiorentini Nutz develops the ideas. Arquiener builds them. The architectural idea can continue through construction under one consistent design, documentation and delivery logic.

  1. 01Idea
  2. 02Design
  3. 03Documentation
  4. 04Construction
Discover Arquiener S.A.